Photo-sensitive
roller shutter for controlling the internal day-lighting and temperature.
Joints
between the precast elements inside the conference room. Width of each precast
element kept to 2.4m in order to avoid application of special transportation
licences.
External
View of the conference room, built with 5 precast elements.
External
view of the Integer Pavilion at Tamar Site. The whole structure is connected
with bolt and nuts. After the exhibition period (11-01 to 10-02), the structure
will be dismantled and move to Shanghai.
Visit
the Integer Official Web Site and learn more.............
Main
entrance of the Integer Pavilion...
External
View of Integer.
Futurewall
System is used as partition in the conference room on G/F. Only a skim coat
is needed on the concrete surface instead of conventional plastering.
Skygarden
on the 1/F. A quarter of a 40-storey residential floor using prefrabrication
construction technique is shown here. Greeneries will be put here for residents
to enjoy. Metal Claddings are used as external finishes.
External
side of another show flat, which is next to the sky garden.
Copyright 2001 Joseph
Chong's Studio.
Special thanks to HR Department of Gammon Skanska Ltd. for organising this
visit.